En

Case study

Case study
/perch/resources/news/tga.jpg
/perch/resources/Products/healthcare2.jpg

Our innovative new L.B. Foster Rail Technologies Network Rail approved TGA3 cabinet is smaller and lighter than previous models, whilst retaining the same operational capacity.

The new design also features a revolutionary two pump arrangement, combining improved performance with reduced power consumption for increased battery life.

Now featuring two smaller pumps, the TGA3 offers operators improved efficiency and control. Each pump services a single rail, ensuring balanced and equalised gel output per rail and improved reliability. The smaller bore delivery pipe is more efficient and makes it more convenient to place. The optimised cabinet offers ease of maintenance access in its internal layout, including a hopper that can slide out horizontally.

featured europe en 05 October 2017 case-studies/details/2017-10-05-smaller-smarter-tga-cabinet-design